Sign In | Join Free | My tjskl.org.cn
China Henan Gold Emperor Industrial Technology Co., LTD logo
Henan Gold Emperor Industrial Technology Co., LTD
China forging parts supplier
Active Member

5 Years

Home > CNC Machining Parts >

Anodizing Alloy Steel Flange Parts CNC Machining Parts

Henan Gold Emperor Industrial Technology Co., LTD

Anodizing Alloy Steel Flange Parts CNC Machining Parts

Brand Name : gold emperor

Model Number : JHF001

Certification : IATF 16949:2016

Place of Origin : china

MOQ : 1000pcs

Price : USD18- USD25 PCS

Payment Terms : T/T

Supply Ability : 1000000PCS/year

Delivery Time : 40 days

Packaging Details : 0.5 square plywood box packing

Material : alloy steel

Oem : yes

Weight : 7.2kg

tolerance : +-0.01

Contact Now

CNC machining parts alloy steel flange parts

Product Specification & Other information List:

Product Type CNC turning, milling, drilling, grinding, wire EDM cutting etc.
Our Services CNC Machining,Plastic Injection,Stamping,Die Casting,Silicone And Rubber,Aluminum Extrusion,Mould Making,etc
Material Aluminum,Brass,Stainless Steel,Copper,Plastic,Wood,Silicone,Rubber,Or as per the customers' requirements
Surface Treatment Anodizing,Sandblasting,Painting,Powder coating,Plating,Silk Printing,Brushing,Polishing,Laser Engraving
Dimension As customers' request
Service Project To provide production design, production and technical service, mould development and processing, etc
Drawing Format: PRO/E, Auto CAD, Solid Works,IGS,UG, CAD/CAM/CAE
Testing Machine Digital Height Gauge, caliper, Coordinate measuring machine, projection machine, roughness tester, hardness tester and so on
Industry used Machinery; heavy duty equipment; electronic device; Auto spare parts; optical telecommunication
Packing Eco-friendly pp bag / EPE Foam /Carton boxes or wooden boxes
As customer's specific requirements
Trial sample time 7-10 days after confirmation
Delivery time 7-30 days after receive the pre-payments
Payment Terms T/T,Western Union,Paypal


Anodizing Alloy Steel Flange Parts CNC Machining Parts

Anodizing Alloy Steel Flange Parts CNC Machining PartsAnodizing Alloy Steel Flange Parts CNC Machining Parts

Business information FAQ


1.Which countries do you export to?
U.S.A, Germany, France, Italy, UK, Brazil, Swedish, Japan, Korea, Middle east of Asia, Thailand,

2.How long does it take to receive samples?
A) Pattern:30-45days after order
B) Sample:30days after pattern finishing.
C) The lead time is the general production period and does not include the transportation time.

3.New product development process
Got tooling order and sample order with 50% deposit---Hold a meeting with the relation dept.To ensure the developing schedule---Design mold, fixture and gauge and making them in our house---mold steel buying---Machining---Inspection---Send out the sample with initial inspection report.

4.How long is the manufacturing lead time?
Mass Production:90days after sample approval by yours.The lead time is the general production period including the transportation time.
We could make some special production arrangement effectively if customer has urgent need.

5 Hao to deal with the quality problem?
A.We perform APQP at an early stage in each project.
B.Our factory must fully understand the quality concerns from customers and implement product & process quality requirements.
C.Our quality professionals who perform patrol inspection in our factories.We perform final inspection before the goods are packed.
D.We have inspectors who perform final audit checks on the packed goods prior to dispatch from China.

6.Can you take responsibility for me?
Of course, I'm happy to help you!But I just take responsibility for my products.Please offer a test report, if it was our fault, absolutely we can make a compensation for you, my friend!

7.What are the payment terms?
Payment terms are negotiable and will improve for long term customers.During the initial stages, we request 50% of tooling fee in advance with the balance payable on acceptance of samples.Production orders can be negotiable.We prefer 50% deposit and the balance by T/T before sails.But sometimes T/T15 days after sails would also acceptable.

8.Which currency can we buy in?
We can deal in USD / Euro currency / RMB

9.How long does it take to ship goods from China by sea?
It takes about 5 weeks to European ports plus 1 week customs clearance, so you can get the container within 6 to 7 weeks.It takes about 2 weeks to east coast and 3 weeks to west coast US ports.All sea goods are shipped from Qingdao Port.

10.How long does it take to ship goods from China by air?
It takes about 7 days to all major destinations.

11.Can we visit the factory to conduct an audit?
Yes, you are welcome to visit our factory.

12.How do we retain client confidentiality?
We are happy to sign Confidentiality Agreements with customers and will honor them.

13.Is there a minimum volume of business required to conduct international purchasing?
There are no minimum volumes, but the prices of the goods, plus the fixed costs of importing makes it more economical to buy in high volumes.All potential customers will be assessed on an individual basis to determine if it appears a viable option for all parties to develop a relationship.

All parts are custom made according to customer's drawings or samples.If you have any parts to be made, please feel free to send your kind drawings/samples to us.Technical drawings including material mark, Product weight, Purchase quantity.The comprehensive information will help us quickly calculate the accurate and reasonable price for you.


Product Tags:

Anodizing Alloy Steel Flange

      

7.2kg Alloy Steel Flange

      

7.2kg Steel Flange Parts

      
Quality Anodizing Alloy Steel Flange Parts CNC Machining Parts for sale

Anodizing Alloy Steel Flange Parts CNC Machining Parts Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Henan Gold Emperor Industrial Technology Co., LTD
*Subject:
*Message:
Characters Remaining: (0/3000)